JW Timber New Office Build
September 2016:
We have started to get underway with the groundworks of our new office block.
With the weather on our side groundworks have got well underway and in what feels like a blink of an eye, we have the footings and brickwork in place ready for our timber frame to be erected above.
Our plans are for the office to be on two floors, clad in our timber and be as eco-friendly as possible.
We are hoping to get the building works back underway after the winter so watch this space!
We are looking to hire a full-time yard assistant, Monday - Friday 7:30-5:00
Read MoreWe are looking to hire a qualified Wood Machinist, either full time or part time (2-3 days per week).
Read MoreJW Timber was featured in Timber Trade Journal (TTJ) magazine.
9/2013Read MoreWe are pleased to report that the initial groundworks for our new purpose built Machine Shop have been completed.
1/2012Read MoreJ.W. Timber wins "The Small Timber Business of the Year" 2011.
1/2012Read More