JW Timber New Office Build

September 2016:

We have started to get underway with the groundworks of our new office block.

With the weather on our side groundworks have got well underway and in what feels like a blink of an eye, we have the footings and brickwork in place ready for our timber frame to be erected above.

Our plans are for the office to be on two floors, clad in our timber and be as eco-friendly as possible.

We are hoping to get the building works back underway after the winter so watch this space!

Other Articles